MENU

Zamboanga Airport Development Project (Continued Rehabilitation of Passenger Terminal Building, Grading of Runway Strip and Asphalt Overlay of Runway

Rate this item
(0 votes)
  • Invitation to Bid (Date Posted: 07/16/18)
  • Bidding Documents Part 1 and 2 (Date Posted:07/16/18)

          Plans and Drawings Part 1 and 2 (Date Posted: 07/16/18)

      General Bid Bulletin

Read 300 times