BAC MATTERS
- Notice to the Public (Date Posted: 06/07/17)
- BAC Matter No. 2014-01(Date Posted 10/25/14)
- BAC Matter No. 2012-03 (Date Posted: 10/12/12)
- Quality Policy Statement
Year 2022
- Consulting Services for the Development and Implementation of the Philippine Railways Institute's Overall Brand (CBAC-RAIL-CS-2022-01) (Date Posted: 25 May 2022)
Year 2020
- Procurement of Consulting Services for the Conduct of Environmental and Social Impact Assessment (ESIA) for the Maritime Safety Enhancement Project (MSEP) Rebid (Date Posted: 03 November 2020)
- Procurement of Consulting Services for the Conduct of Environmental and Social Impact Assessment (ESIA) for the Maritime Safety Enhancement Project (MSEP) (Date Posted: 15 October 2020)
Year 2019
- Consuling Services for the Interfacing of Stations with P3 Electro-Mechanical System of the LRT Line 2 East (Masinag) Extension Project (Date Posted: 31 October 2019)
- Consulting Services for the Appraisal of Land, Structures, Improvements, Crops and Trees Affected by the MRT7 Project (BAC-RAIL-CS-2019-01) (Date Posted:01/18/19)
Year 2018
- Consulting Services for the Appraisal of Land, Structures,Improvements,Crops and Trees Affected by the MRT7 Project (Date Posted: 12/06/18)
- Procurement of Consulting Services for the Conduct of Boracay Island Sea Transport Master Plan Project (Date Posted: 11/05/18)
- Procurement of Consulting Service for the Conduct the Binmaley Ferry Terminal System Development Feasibility Study (Date Posted: 10/23/18)
- Metro Manila Subway Project Phase I - Valenzuela to Parañaque (General Consultant) (Date Posted: 8/16/18)
- Procurement of Consulting Services for the Advance Engineering Study and Detailed Engineering and Design Study for Davao International Airport Project (Date Posted: 05/31/18)
- Procurement of Consulting Services for the Feasibility and Master Plan Study, Environmental Impact Assessment (EIA) Study, and Detailed Engineering and Design Study for the New Siargao Airport Development Project (Date Posted: 05/21/18)
- Procurement of Consulting Services for the Route Rationalization Study for the Metro Manila
Urban Transportation Integration Study (MMUTIS) Update and Capacity Enhancement Project
(MUCEP) Area (Re-Bid) (Date Posted: 03/14/18) - Procurement of Consulting Services for the Route Rationalization Study for the Metro Manila Urban Transportation Integration Study (MMUTIS) Update and Capacity Enhancement Project (MUCEP) Area (Date Posted: 02/21/18)
Year 2016
- Feasibility and Master Plan Study for the Development of the Zamboanga International Airport (Date Posted: 2/3/16)
- Consulting Services (Environmental Impact Assessment Study for Surigao Airport Development Project)
- Feasibility and Master Plan Study, and Environmental Impact Assessment for Masbate Airport Development Project
- Feasibility and Master Plan Study, and Environmental Impact Assessment for M'lang Airport Development Project
- Procurement of Consulting Services for the South Integrated Transport System Terminal Project (Re-bid) (Date Posted: 1/22/16)
Year 2015
- Procurement of Consulting Services for the Environmental Impact Assessment Study for the Surigao Airport Development Project
- Preparation of a Transport Model and Urban Development Strategy for Visayas (Central, Eastern, Western Visayas and Negros Island Region) Project (Re-bid) (Date Posted: 11/3/15)
- Independent Consultant for the South Integrated Transport System (ITS) Terminal PPP Project (Date Posted: 11/3/15)
- Procurement of Consulting Services for the Environmental Impact Assessment Study for the Surigao Airport Development Project (Date Posted: 10/2/15)
- Procurement of Independent Consultant for the Integrated Transport System (ITS) - Southwest Terminal PPP Project [Re-Bid] (Date Posted: 8/1/15)
- Consulting Services for the LRT Line 2 West Extension Project (Detailed Engineering Design and Construction Supervision) (Date Posted: 7/11/15)
- Procurement of Independent Consultant for the Integrated Transport System-Southwest Terminal PPP Project (Date Posted: 5/21/15)
- Consultancy Services for Busuanga Airport Development Project [Re-bid] (Date Posted: 2/7/15)
- Preparation of a Transport Model and Urban Development Strategy for Northern Mindanao Project (Date Posted: 1/30/15)
- Preparation of a Transport Model and Urban Development Strategy for Bicol Region Project (Date Posted: 1/30/15)
- Preparation of a Transport Model and Urban Development Strategy for Eastern, Western, and Central Visayas Project (Date Posted: 1/30/15)
- USTDA Technical Assistance on the Security Vulnerability Assessments Project for Airports Project in the Philippines (Date Posted: 1/26/15)
- MRT3 Rehabilitation and Capacity Expansion Projects:
- Consulting Services for the MRT3 System [Re-bid] (Date Posted: 3/03/15)
- Consulting Services for the MRT3 System (Date Posted: 1/22/15)
Year 2014
- Independent Consultant, LRT Line 1 Extension, Operations and Maintenance [Re-Bid] (Date Posted: 12/30/14)
- Consulting Services for the New Leyte Airport Development Project (Date Posted: 12/23/14)
- Consultancy Services for Busuanga Airport Development Project (Date Posted: 12/01/14)
- Environmental Impact Assessment Study for Naga Airport Development Project (Date Posted: 11/26/14)
- Independent Consultant, LRT Line 1 Extension, Operations and Maintenance (Date Posted: 11/14/14)
- Procurement of Independent Consultant for the Mactan Cebu International Airport PPP Project
- Iloilo International Airport Development Project (Construction Supervision and Detailed Engineering Design)
- Procurement of Consultancy Services for the Development of Bidding Process Monitoring System
- NAIA Runway Optimization Project
Year 2013
- Review of the Land Transportation Office & Land Transportation Franchising and Regulatory Board Business Processes
(Date Posted: 11/11/13) - Environmental Impact Assessment and Social Impact Assessment Studies of the Manila-Quezon City Corridor Improvement Project
(Date Posted: 10/29/13) - Consultancy Services for the Enhancement of Mass Transit Systems in Metro Manila Project [LRT Line 1 South (Cavite) and (Date Posted: 10/22/13)
- Technology-Based Metro Bus Information System and Anti-Colorum Enforcement Sensor Network Project (Date Posted: 10/22/13)
- Feasibility and Master Plan Study for the Laoag International Airport Development Project (Date Posted: 9/26/13)
- Feasibility and Master Plan Study for the Ozamiz City Airport Development Project (Date Posted: 9/26/13)
- Feasibility and Master Plan Study for the Siargao Airport Development Project (Date Posted: 9/26/13)
- Construction Supervision of New Bohol Airport Construction and Sustainable Environment Protection Project (Date Posted: 8/22/13)
- On-Site Independent Assessment of the Manila Area Control Center (MACC) (Date Posted: 8/12/13)
- Revision of the Suite of Oracle Financial Systems resulting from the Revised Chart of Accounts for National Government Agencies (Date Posted: 04/19/13)
- Consulting/ Engineering Services for the Bicol International Airport Development Project (Date Posted: 01/09/13)
Year 2012
- Metro Manila Urban Transportation Integration Study Update and Capacity Enhancement Project (MUCEP)
- P350M Consultancy Services – Civil Works of the LRT Line 2 East (Masinag) Extension Project (Detailed Engineering Design and (Date Posted: 12/21/12)
- Tender Documents Preparation, Assistance in Bidding, and Construction and Maintenance Supervision of the
- Feasibility and Master Plan Study for the Catarman Airport Development Project (Date Posted: 10/10/12)
- Feasibility Study for Manila Bay – Pasig River – Laguna Lake Ferry System (MAPALLA) (Date Posted: 10/4/12)
- Study on the Development of General Santos Aerotropolis (Date Posted: 9/20/12)
- Feasibility and Master Plan Study for Dumaguete Airport Development Project (Date Posted: 9/20/12)
- Feasibility and Master Plan Study for Bagabag Airport Development Project (Date Posted: 9/20/12)
- Feasibility Study for the Upgrade of the Surigao City Airport (Date Posted: 9/13/12)
- Feasibility Study for Bukidnon Airport Development Project (Date Posted: 9/13/12)
- Feasibility Study for the Upgrade of the Naga Airport (Date Posted: 9/13/12)
- Conduct of Topographic Survey and Geotechnical Investigation and Laboratory Testing for New Bohol Airport Construction
- Feasibility and Master Plan Studies - Proposed San Jose, Cam Sur Airport Development Projects
- Feasibility and Master Plan Studies - Proposed Calbayog Airport Development Projects
- Pre-Feasibility Study for Central Spine RORO Project
- Institutional Review of the Business Processes of LTO and LTFRB