Rail Sector
- Supply, Delivery and Comissioning of Rail Grinding Works for DOTr-MRT3
- Supply and Delivery of Impact Wrenches
- Supply and Delivery of Bellows for Spring Pots and Traction Motors
- Supply and Delivery of Articulation Bellows
- Supply and Delivery of Braided Cables
- Supply and Delivery of Various Dipstick for Copper Seals
- Supply and Delivery of M8X22 Terminal Lugs for Traction Motors
- Supply and Delivery of Various Bearings
- Supply and Delivery of Public Announcement (PA) Plates
- Rebuilding of Axle Shafts with hub
- Supply and Delivery of Rubber Insulating Tubes
- Supply and Deliver of Shunting Cables
- Procurement of Track Brake Spindle Drives
- Supply and Delivery of Inverters (24VDC)
- Supply and Delivery of Springs for Spring Pots
- Supply and Delivery of Various Accessories for Spare Parts Under Heavy Maintenance
- Urgent Requirements for Structural Testing, Topographic Survey and Monitoring Plan for MRT3 Structures
- Supply and Delivery of Track Brake Spindle Drives
- Supply and Delivery of Shunting Cables
- Supply and Delivery of Rubber Insulating Tube
- Supply and Delivery of OEM Door Inverter for Fuji Elevators
- Supply and Delivery of Inverters (24VDC)
- Supply and Delivery of Traction Motor Carbon Brushes for MRT3
- Supply and Delivery of Impact Wrenches
- MRT3 Nego Proc for the Urgent Requirements for Structural Testing, Topographic Survey and Monitoring Plan for MRT3 Structures
- Supply and Delivery of Epoxies A & B
- Supply and Delivery of Traction Motor Carbon Brush and Current Return Brush for Axle for a Six-Months Period
- Supply and Delivery of Various Pumps for MRT3
- Supply and Delivery of OEM Electronic Boards for Static Converter
- Critical Requirements for Wooden Sleepers
- Rehabilitation of Underfloor Wheel Lathe Machine
- Supply and Delivery with Supervision of Critical Requirements for OEM Turn-Out Components and Componentries
- Supply and Delivery of Various OEM Parts of MRT3 LRV Door System
- Procurement of Six-Month Maintenance Contract for Fuji Elevators (32 Units)
- Procurement of Six-Month Maintenance Contract for Mitsubishi Escalators
- Supply and Delivery of Contact Springs and Contact Plates for Signalling
- Supply and Delivery of Various Oils and Greases
- Supply and Delivery of Various Spare Parts for Spare Parts under Heavy Maintenance
- Supply and Delivery of Thermit Welding Kits
- Supply and Installations of Fast Moving Parts for Mitsubishi Escalators
- Supply and Delivery of Rechargeable Batteries for Stations
- New Configuration of the LRT Line 1 North Extension Project - Common Station / Unified Grand Central Station (North Extension Project) for the Department of Transportation (DOTr)
- Suppy and Delivery of 78 Units of OEM ACUs for MRT3 LRVs
- Supply and Delivery of Various Bearings and Rolling Stocks for a Six-Month Period
- Procurement of 11,904 pcs of OEM Rubber Blocks for BO 84
- Supply and Delivery of Various OEM Electronic and Mechanical Spare Parts for MRT3 LRV's
- Supply and Delivery of Gearbox Housing Assembly (Rebuild)
- Supply and Delivery of Rebuilt and Fabricated Rolling Stock Heavy Maintenance Spare Parts
- Various Spare Parts for Power
- Various Spare Parts for Overhead Catenary System
- Rental of Trunked Radio Communications for Six Months
- Services of the Independent Safety Audit and Assessment of Electro Mechanical Systems, Rolling Stocks & Other Critical Sub-Systems, & Maintenance Regime of the Manila DOTr-MRT3 System
- Procurement of Various Spare Parts for Tracks
Foreign-Assisted Projects
- Capacity Enhancement of the Mass Transit Systems in Metro Manila LRT Line 2 - East (Masinag) Extension Project (Date Posted: 04/12/17)
- Engagement of an Intelligent Transport Systems and Area Traffic Control Consultant for the Cebu BRT Project
- Engagement of a Procurement Specialist for the Cebu Bus Rapid Transit Project
Goods
- Procurement of Service Provider for the Printing of Media Documentation Materials on the DOTr 2017 Annual Report
- MRT3 - 3 Years Maintenance Service Provider, 43 LRV General Overhauling and Total Replacement of the Signaling System
- Upgrading of MRT3 Signalling System
- Procurement of Philippine Coast Guard Disaster Response Equipment (RHIB and PWC) [230M](Date Posted 11/19/2013)
- PBX Equipment Straight Lease Agreement (Date Posted: 11/11/13)
- Fuel Card Program for DOTC-Central Office (Date Posted: 9/13/13)
- Procurement of Philippine Coast Guard Disaster Response Equipment [14.9M]
- "Kayo ang Boss Ko" Toilet Facilities Improvement Project (Phenolic Board & Stainless Accessories)
Civil Works
- Typhoon Yolanda Rehabilitation Projects
- Albuera Port Project (Date Posted: 3/21/16)
- Basey Port Cluster (Date Posted: 3/21/16)
- Daram Ports Project (Date Posted: 3/21/16)
- Gen MacArthur Port Project (Date Posted: 3/21/16)
- Giporlos Port Project (Date Posted: 3/21/16)
- Lawaan (Poblacion) Port Project (Date Posted: 3/21/16)
- LTFRB Tacloban Regional Office (Date Posted: 3/21/16)
- Maslog Bitaog Ports (Date Posted: 3/21/16)
- Quinapondan Municipal Port Project (Date Posted: 3/21/16)
- Sta. Rita Seawall Project (Date Posted: 3/21/16)
- Rehabilitation of LTO Palompon District Office Building Project (Date Posted: 2/2/16)
- Rehabilitation of Banate Municipal Port Project (Date Posted: 2/2/16)
- Rehabilitation of Marabut Ports Project (Date Posted: 2/2/16)
- Rehabilitation of Eastern Samar Ports Cluster Project (Llorente Port and Hernani Port) (Date Posted: 2/2/16)
- Rehabilitation of Dolores Port Project (Date Posted: 2/2/16)
- Rehabilitation of Catbalogan Port Proiect (Date Posted: 2/2/16)
- Rehabilitation of Balangkayan Port Project (Date Posted: 2/2/16)
- Rehabilitation of LTO Carigara Distrct Offices Building Project (Date Posted: 2/2/16)
- Rehabilitation of Talalora Port Project (Date Posted: 2/2/16)
- Tacloban Airport Project (Asphalt Overlay of Runway & Construction of Turn-Around Pad) (Date Posted: 6/13/14)
- Rehabilitation of the Tacloban Airport Project (Date Posted: 3/24/14)
- NAIA Terminal 1 Rehabilitation Project: Structural Retrofitting, Improvement of Mechanical, Electrical, Plumbing and Fire Protection (MEPF) Facilities and Architectural Works (Date Posted: 12/23/13)
- Surigao, Bislig and Tandag LTO Offices Rehabilitation Projects (Date Posted: 11/4/13)
- “Kayo ang Boss Ko” Toilet Facilities Improvement Project
- Lot 5 - Region 4B: LTO & PPA
- Lot 2 - Region 2: LTO & LTFRB
- Lot 3 - Region 3: LTO, LTFRB & PPA
- Lot 7 - Region 6: LTO, LTFRB, CAAP & PPA
- Lot 8 - Region 7: MCIAA, CPA
- Lot 9 - Region 7: LTO, PPA
- Lot 10 - Region 8: LTO & LTFRB
- Lot 11 - Region 9: LTO, CAAP & PPA
- Lot 14 - Region 12: LTO, LTFRB & CAAP
- Lot 15 - CARAGA Region: LTO, CAAP & PPA
- Lot 20 - NCR Region: PNR
Consulting Services
- Transaction Advisory Services for the North-South Rail Project
- Engagement of a Procurement Specialist for the Cebu Bus Rapid Transit Project
- NAIA Terminal 1 Rehabilitation Project: Construction Management and Supervision for the Structural Retrofitting Improvement of Mechanical, Electrical, Plumbing and Fire Protection (MEPF) Facilities and Architectural Works (Date Posted: 12/23/15)
- Engagement of a Highly Technical Consultant for the Review of the Rolling Stock Design and Depot Layout
for for the LRT Line 1 Extension, Operations and Maintenance Project (Date Posted: 7/08/15) - Engagement of a Highly Technical Consultant for Signalling and Communications for the MRT-3 Capacity Expansion Project
(Date Posted: 3/20/15) - Engagement of a System Analyst for the Development of Bus Management System (Date Posted: 9/22/14)
- Engagement of a Software Architect for the Development of Bus Management System (Date Posted: 9/22/14)
- Engagement of a Consultant for the DOTC Road Transportation IT Infrastructure Project (Date Posted: 9/22/14)
- Engagement of a Consultant for Project Valuation for Public-Private Partnership Projects and Foreign Assisted Projects (Date Posted: 9/17/14)
- Engagement of a Highly Technical Consultant for Rolling Stock and Depot Equipment for the MRT-3 Capacity Expansion Project (Date Posted: 9/16/14)
- Engagement of a Consultant for Project Valuation (Date Posted: 1/13/14)
- Engagement of a Consultant for Project Valuation (Date Posted: 1/7/14)
- NAIA Terminal 1 Rehabilitation Project: Construction Management and Supervision for the Structural Retrofitting Improvement of Mechanical, Electrical, Plumbing and Fire Protection (MEPF) Facilities and Architectural Works (Date Posted: 12/23/13)
Two Failled Biddings
- Negotiated Procurement (Two Failed Biddings) Lease of Transport Service Provider for the DOTr-Central Office (BAC-CO-GS-2022-08N) (Date Posted: 13 May 2022)
- Negotiated Procurement for Printing Services (Date Posted: 13 November 2021)
- Negotiated Procurement for the Consulting Services for the Appraisal of Land, Structures, Improvements, Crops and Trees affected by the MRT7 Projects (Date Posted: 06/03/19)
- Negotiated Procurement for the Consulting Services for Route Rationalization Study for the Metro Manila Urban Transportation Integration Study (MMUTIS) Update and Capacity Enhancement Project (MUCEP) Area (Date Posted: 06/14/18)
- Negotiated Procurement for the Kaputian Port Development Project – Construction of Concrete PlatformConcrete Platform (Date Posted: 11/29/17)
- Negotiated Procurement for the Lease of Transport Service Provider for the DOTr - Central Office Lease of Transport Service Provider for the DOTr - Central Office (Date Posted: 08/31/17)
- Negotiated Procurement of the Independent Consultant for the Integrated Transport System - South Terminal Project (Date Posted: 3/18/16)
- Negotiated Procurement of the Provision of Encoding Services of the DOTC-Central Office (Two Failed Biddings) (Date Posted: 11/3/15)
- Negotiated Procurement of an Independent Consultant for the Southwest Integrated Transport System PPP Project (2 Failed Biddings) (Date Posted: 10/7/15)
- Independent Consultant for the LRT Line 1 Extension, Operations and Maintenance Project (Date Posted: 5/13/15)
- NAIA Runway Optimization Project (Date Posted: 8/15/14)
- Two Failed Biddings (Date Posted: 5/9/14)
Emergency Cases (Section 53.2 of the 2016 Revised IRR of RA 9184)
- Procurement of SARS-COV2 Antigen Test Kits (B06-2021)
- Procurement of SARS-COV2 Antigen Test Kits (B05-2021)
- Procurement of SARS-COV2 Antigen Test Kits (B04-2021)
- Procurement of SARS-COV2 Antigen Test Kits (B03-2021)
- Procurement of SARS-COV2 Antigen Test Kits (B02-2021)
- Procurement of SARS-COV2 Antigen Test Kits (B01-2021)
- Security Services for the DOTr Central and Satellite Office (Date Posted: 22 October 2021)
Scientific, Scholarly or Artistic Work, Exclusive Technology and Media Services (Section 53.6 of the 2016 Revised IRR of RA 9184)
- Procurement of a Service Provider for the Printing of Media Documentation Materials for the DOTr 2021 Annual Report (Accomplishment Report) (Date Posted: 16 March 2022)
- Procurement of Media Monitoring Services for Print, Broadcast and Online (Date Posted: 18 August 2021)
- Procurement of a Service Provider for a Weekly Radio Blocktime Program of the DOTr (Date Posted: 07 July 2021)
- Procurement of a Service Provider for the Printing of DOTr 2020 Annual Report for Documentation (Date Posted: 15 February 2021)
- Procurement of a Service Provider for the Production of Videos for the Public Utility Vehicle Modernization Program (PUVMP)
- Procurement of a Service Provider for the Printing of Media Documentation Materials on the DOTr 2019 Annual Report
- Procurement of Services for the National Information Campaign for the Public Utility Vehicle (PUV) Modernization Program (Date Posted: 28 October 2019)
- Procurement of a Media Service Provider for the Production of One (1) Audio Visual Presentation (AVP) of 12 Minutes on DOTr Accomplishments from January to December 2018 (Date Posted: 05/29/19)
- Procurement of a Service Provider for the Prinlting Media Documentation Materials on the DOTr 2018 Accomplishments: Then and Now (Date Posted: 05/28/19)
- Procurement of a Media Service Provider for Print, Broadcast, and Online News Monitoring with Daily Alerts for a Period of One (1) Year (Date Posted: 12/28/18)
- Procurement of a Service Provider for the Production of Three (3) Slots of at least Thirty (30) Seconds each of Audio Visual Presentation (AVP) on Road Transportation Safety (Date Posted: 12/27/18)
- Procurement of a Service Provider for the Production of a 11-Minute Audio-Visual Presentation (AVP) on the DOTr Accomplishment From July 2016 to July 2017 (Date Posted: 12/05/17)
Highly Technical Consultant (Section 53.7 of the 2016 Revised IRR of RA 9184)
- Procurement of a Highly Technical Consultant for the National Standard (NS) Based Interoperable Automated Fare Collection (AFC) (Date Posted: 23 June 2021)
- Engagement of a Highly Technical Consultant to assist in Maintaining the Quality Management System Certification for ISO 9001:2015 Standards in the Procurement Process of the Department (Date Posted: 15 June 2020)
- Procurement for the Engagement of a Highly Technical Consultant for the AFCS Scheme Provider (Date Posted: 12/20/18)
- Engagement of a Highly Technical Consultant to Assist in the Establishment of a Quality Management System Certification to ISO 9001:2015 Standards in the Procurement Process of the Department (Date Posted: 06/20/18)
- Procurment of a Highly Technical Consultant for Foreign Assisted Project and Public Partnership (Date Posted: 12/29/17)
Direct Retail Purchase (Section 53.14 of the 2016 Revised IRR of RA 9184)
- Procurement of Gasoline, Diesel, Fuels and Lubricants (with Fuel Card Technology) (Date Posted: 20 April 2022)