Year 2018
- PMR for the DOTr - MRT3 (Maintenance Transition Team Projects) as of 31 December 2018
- PMR for DOTr - Central Office for CY 2018 (2nd Semester)
- PMR for Maritime Sector for CY 2018 (2nd Semester)
- PMR for Aviation and Airports Sector for CY 2018 (2nd Semester)
- PMR for Maritime Sector for CY 2018 (1st Semester)
- PMR for Aviation and Air Sector for CY 2018 (1st Semester)
- PMR for DOTr-Central Office for CY 2018 (1st Semester)
- PMR for Road Sector for CY 2018 (1st Semester)
- PMR for DOTr-MRT3 (Maintenance Transition Team Projects) as of 06 July 2018
Year 2016
- Consulting Services for Masbate ADP (Feasibility and Master Plan Study, and Environmental Assessment Study) (Date Posted: 05/12/2017)
- Masbate ADP (Asphalt Overlay of Runway and Proposed Shoulder Grade Correction) (Date Posted: 05/12/2017)
- Romblon ADP (Asphalt Overlay of Runway, Shoulder Grade Correction, Construction of Perimeter Fence, Construction of Security Fence with gate and Concreting of Vehicular Parking) (Date Posted: 05/12/2017)
- Calbayog ADP (Construction of PTB with Shed, Expansion of Apron and New Taxiway, Construction of Drainage System and Site Development) (Date Posted: 05/12/2017)
- Bicol IADP Package 2B (Construction of PTB, Runway Completion and other Site Development Works) (Date Posted: 05/12/2017)
- Gensan IADP (Rehabilitation and Expansion of Existing PTB) (Date Posted: 05/03/2017)
- Ozamiz ADP (Asphalt Overlay of Runway) (Date Posted: 05/03/2017)
- Surigao ADP (Asphalt Overlay of Runway and Shoulder Grade Correction) Asphalt Overlay of Runway and Shoulder Grade Correction) (Date Posted: 05/03/2017)
- Catarman ADP (Re-blocking of Existing Apron)Re-blocking of Existing Apron) (Date Posted: 05/03/2017)
- Gensan IADP (Expansion of Apron and Construction of Drainage and Storm Drains) (Date Posted: 04/27/2017)
- Ozamiz ADP (Continuation of Riverbank Protection) (Date Posted: 03/21/2017)
- Consulting Services for Zamboanga Airport Development Project (Feasibility and Master Plan Study) (Date Posted: 03/17/2017)
- Consulting Services for M'lang Airport Development Project (Feasibility and Master Plan Study and Environment Assessment Study) (Date Posted: 03/17/2017)
- Consulting Services for the South Integrated Transportation Project (2 Failed Biddings) (Date Posted: 03/16/17)
- Procurement of Integration of Enterprise Proxy with Web Security and Link Load Balancer (Re-Bid) (Date Posted: 03/16/17)
- Mati Airport Development Project Rehabilitation of Existing Terminal Building (Date Posted: 03/15/17)
- Bicol ADP Package 2A (Re-Bid) (Date Posted: 12/06/16)
- Bicol ADP Package 2B (Re-Bid) (Date Posted: 12/06/16)
- Calbayog ADP (Construction of New Passenger Terminal Building with Shed, Expansion of Apron and New Taxiway, Construction (Date Posted: 12/06/16)
- Gensan ADP (Expansion and Rehabilitation of Existing Terminal Building) (Date Posted: 12/06/16)
- Gensan ADP (Expansion of Apron and Construction of Drainage and Storm Drains) (Date Posted: 12/06/16)
- LRT Line 2 East (Masinag) Extension Package 2 - Design and Build of Stations (Date Posted: 12/06/16)
- Masbate ADP (Aphalt Overlay of Runway and Proposed Shoulder Grade Correction) (Date Posted: 12/06/16)
- Ozamis ADP (Asphalt Overlay of Runway) (Date Posted: 12/06/16)
- Sanga-Sanga ADP (Expansion and Extension of Runway) (Date Posted: 12/06/16)
- Surigao ADP (Asphalt Overlay of Runway and Shoulder Grade Correction) (Date Posted: 12/06/16)
- Tagbilaran ADP (Asphalt Overlay of Runway) (Date Posted: 12/06/16)
- Virac ADP (Asphalt Overlay of Runway including Provision of Runway Shoulder) (Date Posted: 12/06/16)
- Construction of Vessels and Related Services for the Maritime Safety Capability Improvement Project for
the Philippine Coast Guard (Date Posted: 06/28/16)
Year 2015
- PMR for Year 2015 Projects
- Calbayog ADP (Runway Widening including Shoulder Grade Correction and Runway Asphalt Overlay) (Date Posted: 12/06/16)
- Siquijor ADP (Completion of Concreting of Runway and Shoulder Grade Correction) (Date Posted: 12/06/16)
Others
- Upgrading of Meteorological Instruments at Various Airports
- Observers for the DOTC BIDS and Awards Committee
- Janitorial Services for the DOTC Central Office
- Disaster Response Equipment for the PCG (Lot 1 50 Units Rubber Boats)
- Cotabato Airport (Widening of Runway and Taxiway and Construction of Perimeter Fence)
- Ormoc Airport (Asphalt Overlay of Runway)